A/C Flexible Duct And Spa Deck Work

Flexible Duct And Spa Deck work continues

Well This post includes some AC Duct upgrades and the hot tub deck, Last year the deck was built for the hot tub, the tub was removed for the winter, before I set it back up I decided to add a roof and treat the pressure treated wood which I always like to dry out before adding sealer, etc. along with that it needed a roof plus an awning for some rain protection for the outside seats at the bar area.

Not related to the deck I went into the attic and replaced the A/C flexible vent hoses that have been there since the 80’s. This needed to be addressed because in the summer attic heat had condensation water forming and drops were failing into the 2 rooms upstairs, one vent was over my bed which hit me in the face at night on occasion. The colder weather outside is the time to go up there to do this kind of work. I added more insulation on top of the metal boxes and will see how this works out when the summer heat arrives again, I already added a exhaust fan 2 years ago which helped somewhat.

I did not want to make 2 posts so this has both pictures of the attic and the deck with a roof and awning.

The Spa Hot Tub Project: Completed, Tips for Installation and Usage

The Spa Hot Tub Project has been completed (well almost) and the water temp was set to 101 degrees, now the muscle and joint pains can get some relief.

Well let’s start with the purchase, I was not looking for spa tub but came across a one day deal for $317 was kinda hard to turn down since the regular price was $500. So I clicked YES and ordered it. Now where to put it? Where to get power? Where can I place 2,000 pounds (with 220 gals of water) Ok behind the garage where I could build a raised deck and add power from the wall right behind the garage.

I had to move the gas grill and ladder hanging outside the garage along with the outdoor storage bin, but not that much really, plus I wanted rain water to still make it into the ground for the tree roots.

Well the project went smooth, I used all pressure treated wood, 2×6 and 4×4’s with 2 added to the middle for extra support all down about 2 feet with cement.( I used fast set cement pour into hole and just add water). The deck boards along with the 2x6s were all 8 footers so the deck size was also about 8′ x 8′ with the price of wood nowadays the deck cost more than the tub!

The electrical outlet was added (GFCI) with a “In-Use” cover, I added 1/2″ foam board to help pad the tub and add some insulation for the hot water.

We used tap water to fill it and it showed about 57 degrees from the start, yesterday we were in it at 100 degrees and it was great! It does take some time to get hot, I’m seeing about 1.5 degree increase every hour. My guess is the heater can’t be that strong to allow the unit to use a standard 15 amp 120v outlet, As I recall it uses about 12 amps of power with the heater on.

Now we can continue the work around the house and get some spa therapy as needed.