The Smokehouse repairs continue in 2026, I took a break from 2025 repairs due to weather and other smaller repairs that have kept me busy, the post I made with new den flooring will show I had about 400 square feet of pine flooring that was removed. These were about 14 feet long and 10-11 inches wide, I had to cut these down to roughly 10 feet and 8 inches wide to recycle them to siding to use on the smokehouse.

This outside building is over 200 years old, no telling how many times it has been worked on , However it is nearing completion so I wanted to post something today as it has been some time since my last post.