The sidewalk rebuild has been completed, I lost count on how many 80lb bags of cement were used but it was a lot. The walkway that was here was getting consumed by the earth as you can see from one older picture I took before I started, now it’s raised up higher than the ground level which will help with heavy rain that use to push soil over the walkway.
The guest house sidewalk also needs to be replaced up to the fire pit however it is not a big priority at this time. The next priority will be the main house heating and cooling system which has cost over $300 per month to cool the house.